Stormwater Compliance

Location

Pepsi-Cola Central Processing Facility, Ayer, MA

Client

Pepsi, CPF, Inc.

Project Highlights:

Morse was hired to review this existing 20-acre industrial property for compliance with the EPA NPDES Stormwater Requirements.  Services included the following:

– Provide existing conditions topographical survey of 20-acre facility and identify all drainage improvements (catchbasins, pipes, swales etc.) and downstream drainage discharge points.

– Prepare EPA Industrial Stormwater Discharge Permit Application.

– Inspect interior drainage (floor drains, roof drainage, covered loading bays) improvements and provide interior piping schematic drawing.

– Prepare Spill Response Plan and Drainage BMP Operation & Maintenance Plan for entire site.