“Parcel 3” Feasibility Study
2010 08 23 19 36 49Location: Scituate, MA
Client: Town of Scituate

Washington Street (Rt. 53), Weymouth, MA
2010 08 23 19 36 37Location Weymouth, MA Project Description: Hydraulic Design of cofferdam and by-pass pumping for a culvert repair underneath Washington Street (MassHighway Route 53) at the Weymouth Public Drinking Water Supply Reservoir. Temporary bypass pumping with backup pumping for 5,000 gallon/minute capacity. Construction dewatering plan to lower the level of the reservoir at the proposed culvert repair project.
View Project